Engine bay is done. Paint is on and it looks infinitely better than the mess that it once was. Going to let that dry for a day or 2 then position the engine / tranny down in.
The shifter is bolted to the floor in the pic. Still needs a piece of carpet between the seats and under the shifter. Shifter required some fabrication to mount it right where I wanted. Some cutting, grinding, drilling and welding on 3 pieces of steel, then bolted to the car using factory holes.
|